|
When completed Lebuh Raya Sprint will implement an Intelligent Transport System (ITS) for a comprehensive traffic management system on the highway to further enhance free-flow convenience for the motorists. Lebuh Raya Sprint will have:
Traffic Control and Surveillance System with a Central Computer system to monitor traffic controller, variable message signs, traffic counting detector, congestion detector and the data transmission system.
Closed Circuit TVs (CCTV) will be installed at strategic points along the highway to monitor the traffic situation so that motorists can be kept informed of the situation to better plan their journey.
Variable Message Signs (VMS) display boards will be installed at the designated locations along the highway to provide real time traffic events to approaching motorists on Lebuh Raya Sprint.
Enhanced Vehicle Actuation (EVA) system, computerised to read and manage traffic volumes at signalised traffic junctions by controlling the "green time" of traffic signals will also be installed for the convenience of the motorists.
Electronic Toll Collection (ETC) service where motorists using a prepaid electronic toll tag can pay the toll fare at dedicated toll lanes at the Sprint's toll plazas without having to stop and queue at the toll plazas, providing faster travel. It is also convenient as the prepaid amount can be automatically topped up without having to go to the customer service counters. |